E-mail: sale@lushuntec.com
    CNG/LNG Loading Arm
    You are here: Home » Products » CNG/LNG Refueling Station Equipment

    PRODUCT DETAIL

    loading

    Share to:
    sharethis sharing button

    CNG/LNG Loading Arm

    Availability:
    Quantity:

    CNG/LNG Loading Arm

    The RCZB series CNG loading and unloading arms and RLZB series LNG loading and unloading arms produced by our company are designed and manufactured according to the technical parameters given by the user and in accordance with the HG/T21608-2012 liquid loading and unloading arm standard. The envelope range meets the on-site use conditions and is designed according to the no-load balance. They are used for transferring fluid media between the loading platform and the tanker to complete material loading and unloading work. The existing room temperature/low-temperature CNG loading and unloading arms and low-temperature LNG loading and unloading arms are widely used in companies such as Xinao Gas and PetroChina.

    · The loading and unloading arm is equipped with a column, and the pipeline is installed on the column. The lower end of the column is equipped with a connecting base plate.

    · Fixed on the loading and unloading platform with 4 bolts.

    · The single arm structure consists of a liquid phase arm for the pipeline.

    · The dual arm structure consists of a gas phase arm and a liquid phase arm in a pipeline.

    · The three arm structure consists of a gas phase arm, a liquid phase arm, and a booster arm.

    · The CNG loading and unloading arm is a single arm structure, and the pipeline is a gas-phase arm.

    微信截图_20250123160025.png


    PRODUCT INQUIRY
    Home
    Addr.:  4F, Building 45, No.1 Sendi Avenue, Xipeng Town, Jiulongpo District, Chongqing   E-mail: sale@lushuntec.com
    Tel: 0086-23-65226016   Fax : 0086-23-65226026    
    Copyright: 2024 Chongqing Lushun Scientific & Technological Development Co., Ltd.